Cost Estimating Manual for Pipelines and Marine Structures
Year: 1977 Language: english Author: John S. Page Genre: Technical book Edition: 1 ISBN: 978-0872011571 Format: PDF Quality: Scanned pages Pages count: 316+ Description: This manual has been compiled to provide time frames, labor crews and equipment spreads to assist the estimator in capsulizing an estimate for the installation of cross-country pipelines, marshland pipelines, nearshore and surf zone pipelines, submerged pipelines, wharfs, jetties, dock facilities, single-point mooring terminals, offshore drilling and production platforms and equipment and appurtenances installed thereon. The time frames and labor and equipment spreads which appear throughout this manual are the result of many time and method studies conducted under varied conditions and at locations throughout the world; these time frames and labor and equipment spreads reflect a complete, unbiased view of all operations involved. When one is engaged in compiling an estimate from any information furnished by others, as is the case with this manual, he should view it in an objective light, giving due consideration to the nature of the project at hand and evaluating all items that may affect the productivity of labor and all other elements involved.
Вы не можете начинать темы Вы не можете отвечать на сообщения Вы не можете редактировать свои сообщения Вы не можете удалять свои сообщения Вы не можете голосовать в опросах Вы не можете прикреплять файлы к сообщениям Вы не можете скачивать файлы
Cost Estimating Manual for Pipelines and Marine Structures
Year: 1977
Language: english
Author: John S. Page
Genre: Technical book
Edition: 1
ISBN: 978-0872011571
Format: PDF
Quality: Scanned pages
Pages count: 316+
Description: This manual has been compiled to provide time frames, labor crews and equipment spreads to assist the estimator in capsulizing an estimate for the installation of cross-country pipelines, marshland pipelines, nearshore and surf zone pipelines, submerged pipelines, wharfs, jetties, dock facilities, single-point mooring terminals, offshore drilling and production platforms and equipment and appurtenances installed thereon.
The time frames and labor and equipment spreads which appear throughout this manual are the result of many time and method studies conducted under varied conditions and at locations throughout the world; these time frames and labor and equipment spreads reflect a complete, unbiased view of all operations involved.
When one is engaged in compiling an estimate from any information furnished by others, as is the case with this manual, he should view it in an objective light, giving due consideration to the nature of the project at hand and evaluating all items that may affect the productivity of labor and all other elements involved.
Contents
Screenshots
hidden
Скачать [17 KB]
Поделиться