Guidance Notes on Life Extension Methodology For Floating Production Installations
Year: 2021 Language: english Author: ABS Genre: Methodological guide Publisher: ABS Format: PDF Quality: eBook Pages count: 51 Description: The Guidance Notes on Life Extension Methodology for Floating Production Installations have been developed to provide guidance for assessment of existing floating production installations when the intended period of operation at the original site or the cumulated operating time at both the original and relocated sites is extended beyond the original design life period. These Guidance Notes supplement the requirements for life extension and relocation of floating production installations in accordance with the ABS Rules for Building and Classing Floating Production Installations (FPI Rules). These Guidance Notes outline the life extension process that includes a reassessment of the structure, mooring system, stability, and machinery and systems, etc., for the entire installation. This reassessment includes engineering and survey activities. In the May 2021 edition, a new Appendix 3 introduces a methodology for addressing Remaining Fatigue Life for FPSOs based on Loading Historical Data acquired on board during the vessel’s Service Life. These Guidance Notes become effective on the first day of the month of publication.
Вы не можете начинать темы Вы не можете отвечать на сообщения Вы не можете редактировать свои сообщения Вы не можете удалять свои сообщения Вы не можете голосовать в опросах Вы не можете прикреплять файлы к сообщениям Вы не можете скачивать файлы
Guidance Notes on Life Extension Methodology For Floating Production Installations
Year: 2021
Language: english
Author: ABS
Genre: Methodological guide
Publisher: ABS
Format: PDF
Quality: eBook
Pages count: 51
Description: The Guidance Notes on Life Extension Methodology for Floating Production Installations have been developed to provide guidance for assessment of existing floating production installations when the intended period of operation at the original site or the cumulated operating time at both the original and relocated sites is extended beyond the original design life period. These Guidance Notes supplement the requirements for life extension and relocation of floating production installations in accordance with the ABS Rules for Building and Classing Floating Production Installations (FPI Rules).
These Guidance Notes outline the life extension process that includes a reassessment of the structure, mooring system, stability, and machinery and systems, etc., for the entire installation. This reassessment includes engineering and survey activities.
In the May 2021 edition, a new Appendix 3 introduces a methodology for addressing Remaining Fatigue Life for FPSOs based on Loading Historical Data acquired on board during the vessel’s Service Life.
These Guidance Notes become effective on the first day of the month of publication.
Contents
Screenshots
fpi-life-extension-gn-may21.pdf
Скачать [1 KB]
Поделиться