If i want to load lets say 24135 MT of iron ore in a ship, how much draft will the ship has by the end of the loading operations? I have some information if needed: DWT: 43479.3 mt Summer Draft: 10.7 meters Deductible weights: 700 mt tpc: 54.7 Density of the water: 0.996 LOA: 189.99 LBP: 186.65 BREATH MOULDED: 30 Lightship: 10072.5
It depends on the lightship draft and the hydrostatic curves also, You must have those things to estimate the draft with load ( assuming that it doesn't pitch)
You can post new topics in this forum You can reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You can attach files in this forum You can download files in this forum
I have some information if needed:
DWT: 43479.3 mt
Summer Draft: 10.7 meters
Deductible weights: 700 mt
tpc: 54.7
Density of the water: 0.996
LOA: 189.99
LBP: 186.65
BREATH MOULDED: 30
Lightship: 10072.5