Year: 2008 Language: english Author: SIGTTO Genre: Guide Publisher: Witherby Publishing Group Ltd Format: PDF Quality: eBook Pages count: 12 Description: The present document is mainly intended to provide all members of the Organization with the guidelines of the requirements that are applicable to the testing the LNG cargo handling systems. The scope of the publication shall be considered applicable to the designs featuring established membranes, SPB and spherical tanks. Note that the content shall not be extended to the prototypes and novel ship designs since they will most probably require some specific approach, for example additional testing. Moreover, this paper shall not be treated as a sort of operational procedures; it is rather an aid to preparation of a specification to be used during the gas trials. The authors have tried to address all items that have to be tested before the vessel is handed-over as well as the testing done after the delivery, at the time of loading of the first cargo. The figures there in the text of the document are indicative and it would be better to refer to the shipbuilder's/manufacturer's recommendations for figures for the particular ship. It is assumed that the trials are done by the shipbuilder before delivery, which is actually the common practice. The trials themselves are conducted to confirm the correct operation of the handling systems.
Contents
Screenshots
5
SIGTTO Guide for Planning Gas Trials for LNG Vessels.pdf
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You cannot download files in this forum
Guide for Planning Gas Trials for LNG Vessels
Language: english
Author: SIGTTO
Genre: Guide
Publisher: Witherby Publishing Group Ltd
Format: PDF
Quality: eBook
Pages count: 12
Description: The present document is mainly intended to provide all members of the Organization with the guidelines of the requirements that are applicable to the testing the LNG cargo handling systems. The scope of the publication shall be considered applicable to the designs featuring established membranes, SPB and spherical tanks.
Note that the content shall not be extended to the prototypes and novel ship designs since they will most probably require some specific approach, for example additional testing. Moreover, this paper shall not be treated as a sort of operational procedures; it is rather an aid to preparation of a specification to be used during the gas trials. The authors have tried to address all items that have to be tested before the vessel is handed-over as well as the testing done after the delivery, at the time of loading of the first cargo.
The figures there in the text of the document are indicative and it would be better to refer to the shipbuilder's/manufacturer's recommendations for figures for the particular ship. It is assumed that the trials are done by the shipbuilder before delivery, which is actually the common practice. The trials themselves are conducted to confirm the correct operation of the handling systems.