Year: 2015 Language: english Author: MAIB Genre: Documentation Format: PDF Quality: eBook Pages count: 86 Description: At 2109 on 3 January 2015, the pure car and truck carrier Hoegh Osaka was rounding West Bramble buoy in The Solent when it developed a significant starboard list causing some cargo shift and consequent flooding. With the list in excess of 40°, the ship lost steerage and propulsion, and subsequently drifted onto Bramble Bank, grounding at 2115. Hoegh Osaka had sailed from the port of Southampton, bound for Bremerhaven, at 2006. A pilot was embarked and there were 24 crew on board. Following the accident, all crew were successfully evacuated from the ship or recovered from the surrounding waters. There was no pollution. A major salvage operation successfully refloated Hoegh Osaka and it was subsequently taken to a safe berth in Southampton on 22 January.
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You cannot download files in this forum
PCTC Hoegh Osaka-MAIB Report
Language: english
Author: MAIB
Genre: Documentation
Format: PDF
Quality: eBook
Pages count: 86
Description: At 2109 on 3 January 2015, the pure car and truck carrier Hoegh Osaka was rounding West Bramble buoy in The Solent when it developed a significant starboard list causing some cargo shift and consequent flooding. With the list in excess of 40°, the ship lost steerage and propulsion, and subsequently drifted onto Bramble Bank, grounding at 2115.
Hoegh Osaka had sailed from the port of Southampton, bound for Bremerhaven, at 2006. A pilot was embarked and there were 24 crew on board. Following the accident, all crew were successfully evacuated from the ship or recovered from the surrounding waters. There was no pollution. A major salvage operation successfully refloated Hoegh Osaka and it was subsequently taken to a safe berth in Southampton on 22 January.
Contents
Screenshots
PCTC Hoegh Osaka-MAIB Report.pdf
Download [3 KB]
Share