Bunkering of Liquefied Natural Gas-fueled Marine Vessels in North America, 2nd Edition
Year: 2015 Language: english Author: ABS Genre: Guide Format: PDF Quality: eBook Pages count: 200 Description: Since this report was initially issued in March 2014, significant progress has been made in North America with the use of LNG as a fuel for marine vessels. Of particular note, is the first LNG bunkering and gas-fueled vessel operation in North America. Harvey Gulf International Marine, LLC (HGIM) has conducted the first gas fuel bunkering procedure of their newest Offshore Support Vessel (OSV), HARVEY ENERGY1. HARVEY ENERGY, constructed by Gulf Coast Shipyard Group, is a Dual Fuel Diesel OSV and the first gas fueled vessel to be constructed in North America. It is United States (US) flagged, and classed by ABS. The vessel is powered by three Wärtsilä 6L34DF dual fuel gensets providing 7.5 megawatts of power that are supplied fuel via Wärtsilä’s LNGPac system.
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You cannot download files in this forum
Bunkering of Liquefied Natural Gas-fueled Marine Vessels in North America, 2nd Edition
Language: english
Author: ABS
Genre: Guide
Format: PDF
Quality: eBook
Pages count: 200
Description: Since this report was initially issued in March 2014, significant progress has been made in North
America with the use of LNG as a fuel for marine vessels. Of particular note, is the first LNG
bunkering and gas-fueled vessel operation in North America. Harvey Gulf International Marine,
LLC (HGIM) has conducted the first gas fuel bunkering procedure of their newest Offshore
Support Vessel (OSV), HARVEY ENERGY1.
HARVEY ENERGY, constructed by Gulf Coast Shipyard Group, is a Dual Fuel Diesel OSV and the
first gas fueled vessel to be constructed in North America. It is United States (US) flagged, and
classed by ABS. The vessel is powered by three Wärtsilä 6L34DF dual fuel gensets providing 7.5
megawatts of power that are supplied fuel via Wärtsilä’s LNGPac system.
Contents
Screenshots
ABS-LNGBunkering-NAmerica-2015_03.pdf
Download [6 KB]
Share