ISO 12215:10-2020 / Small craft — Hull construction and scantlings — Part 10: Rig loads and rig attachment in sailing craft
Year: 2020 Language: English Author: ISO Genre: Нормативный документ Publisher: ISO Edition: 1st edition Format: PDF Quality: eBook Number of pages: 86 Description: The reason underlying the preparation of the ISO 12215 series is that scantlings rules and recommended practices for small craft differ considerably, thus limiting the general worldwide acceptability of craft. This document has been set towards the minimal requirements of the current practice. The dimensioning according to this document is regarded as reflecting current practice, provided the craft is correctly handled in the sense of good seamanship and equipped and operated at a speed appropriate to the prevailing sea state. This document is not a design standard, and designers/builders are strongly cautioned from attempting to design craft such that nearly all structural components only just comply. The connection between the rig attachment and the structure is required to be stronger than the rig attachment itself. It is therefore considered that unforeseen overload will not entail its detachment from the structure, and that the watertight integrity will be maintained. Additional info: This document was prepared by ISO/TC 188, Small craft. A list of all parts in the ISO 12215 series can be found on the ISO website.
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum You cannot attach files in this forum You cannot download files in this forum
ISO 12215:10-2020 / Small craft — Hull construction and scantlings — Part 10: Rig loads and rig attachment in sailing craft
Language: English
Author: ISO
Genre: Нормативный документ
Publisher: ISO
Edition: 1st edition
Format: PDF
Quality: eBook
Number of pages: 86
Description: The reason underlying the preparation of the ISO 12215 series is that scantlings rules and recommended practices for small craft differ considerably, thus limiting the general worldwide acceptability of craft.
This document has been set towards the minimal requirements of the current practice.
The dimensioning according to this document is regarded as reflecting current practice, provided the craft is correctly handled in the sense of good seamanship and equipped and operated at a speed appropriate to the prevailing sea state.
This document is not a design standard, and designers/builders are strongly cautioned from attempting to design craft such that nearly all structural components only just comply.
The connection between the rig attachment and the structure is required to be stronger than the rig attachment itself. It is therefore considered that unforeseen overload will not entail its detachment from the structure, and that the watertight integrity will be maintained.
Additional info: This document was prepared by ISO/TC 188, Small craft.
A list of all parts in the ISO 12215 series can be found on the ISO website.
Contents
Screenshots
ISO 12215-10-2020.pdf
Download [12 KB]
Share