princimarfaith ®   25-Jun-2021 12:38

Ballast Water Treatment System Erma First Manual


Year: 2019
Language: russian / english
Author: Manual
Genre: Manual
Format: PDF
Quality: eBook
Number of pages: 600
Description: Principles of ballast water management system (BWMS) operation
The ERMA FIRST BWTS system developed by ERMA FIRST S.A. is autonomous, modular and reliable for
the treatment of ballast water, with respect to the D-2 standard of the International Convention for
the Control and Management of Ships’ Ballast Water and Sediments.
Additional models were added in order to exceed all the special installation requirements either for
New Building vessels or especially any retrofit project.
During ballasting, the incoming/ upcoming water goes through filtration, to remove particles and
organisms larger than 40 microns. The filtered water will then enter the electrolysis module where
the remaining viable organisms will be eliminated.
During de-ballasting, the system main components are by-passed while the neutralization module is
operating. Water is discharged overboard -after neutralization.
Ιsokinetic G2 sampling port is placed on the discharge line enabling authorities to sample treated
ballast water prior to discharge and verify BWTS operation and efficiency.

Contents

CONTENTS
OVERALL INFORMATION AND SPECIFICATIONS
ELECTRICAL CONNECTIONS AND WIRING
1 HANDLING, INSTALLATION AND STORAGE
1.1 SAFETY INSTRUCTIONS
2 ENVIRONMENT, HEALTH AND SAFETY (EHS) REQUIREMENTS
2.1 ENVIRONMENTAL EFFECT OF ERMA FIRST BWTS
3 MANUFACTURER’S INFORMATION
3.1 MARKING REQUIREMENTS
4 PRINCIPLES OF BALLAST WATER MANAGEMENT SYSTEM (BWMS) OPERATION
4.1 PROCESS/TECHNOLOGY LIMITATIONS OF THE ERMA FIRST BWTS FIT 200
5 MAJOR SYSTEM COMPONENTS
5.1 FILTER
5.1.1 Normal Flow Pattern
5.1.2 Flushing Cycle
5.1.3 Service Clearance Guidelines
5.2 SUCTION PUMP
5.3 ELECTROLYZER(S)
5.3.1 Installation instructions
Monitoring
5.4 TRANSFORMER/ RECTIFIER (T/R) UNIT
5.4.1 Preventive maintenance
5.4.2 Troubleshooting instructions
5.5 TRO SENSORS
5.5.1 Installation instructions
5.5.2 Reagents lifetime
5.6 FLOW METER
5.7 NEUTRALIZATION MODULE
5.8 MONITORING AND CONTROL AUXILIARY EQUIPMENT
5.9 BWTS CONTROL PANEL
5.9.1 Control panel switches/ buttons
5.10 REPEATER PANEL
5.11 VISUAL AND AUDIO MEANS
5.11.1 For the control panel
5.11.2 For the repeater panel
5.12 HUMAN MACHINE INTERFACE (HMI)
6 OPERATION
6.1 DESCRIPTION OF BWTS CONDITIONS AND MODES
6.2 OPERATING VALVES FOR BOTH BALLAST AND DE-BALLAST OPERATION
6.3 BALLAST OPERATION
6.3.1 Ballast operation
6.4 DE-BALLAST OPERATION
6.4.1 De-Ballast operation
6.5 ALARMS
6.5.1 Alarms list - During ballasting
6.5.2 Alarms list - During De-ballasting
6.6 TROUBLESHOOTING
7 MAINTENANCE SCHEDULES
7.1 UPON FAILURE
8 ERMA FIRST BWTS FIT 0201 SCOPE OF SUPPLY [BOM]
9 SPARE PARTS LIST
9.1 FILTER
9.2 TRO MONITOR
9.3 DOSING PUMP (DDA 30-4)
9.4 CONTROL PANEL
9.5 VALVES
9.6 DIAPHRAGM AIR PUMP
10 BWTS 0201 CERTIFICATES
10.1 CERTIFICATE FROM GREEK AUTHORITY [IMO-TYPE APPROVAL]
10.2 LR APPROVAL
10.3 USCG APPROVAL
10.4 LIBERIA APPROVAL
10.5 CYPRUS TYPE APPROVAL
10.6 INVENTORY OF HAZARDOUS MATERIALS
11 DATA RETRIEVAL

Screenshots

BWTS ERMA FIRST.rar

Download [18 KB]

Thank U
Reply
Kulish   14-Sep-2024 10:22
zdarov, скажи спасибо что не на Греческом !!
0
Reply
refresh list

Similar releases

Ballast Water Management System SAMSUNG PURIMAR ( manuals, video) - SAMSUNG [2019, Other]
AALBORG MISSION OL 20000 + AQ-2 (Instruction manual) [2005, PDF]
Ballast Water Treatment System (Trojan marinex) - Trojan Marinex [2017, PDF]
RWO Installation and Operating Instructions for CleanBallast - RWO GmbH [2011, PDF]
LR Ballast Water Management Plan Template D2 Standard 2025 - LR [2025, DOCx]
SAM Electronics PWM Shaft Generator Plant - SAM Electronics GmbH [2005, PDF]
SAACKE Boiler CD Manual [2006, HTML]
AALBORG burner type WH MS7Z [PDF]
Instruction Manual for Mission OS Boiler, KBO-E Burner - AALBORG [2008, PDF]
Mitsubishi Self Ejector Genius-Series (Operation Manual 2) - Mitsubishi [PDF]
LOAD MORE
  • Reply

The time now is: Today 22:47

All times are GMT + 3 Hours