Year: 2019 Language: russian / английский Author: Manual Genre: Manual Format: PDF Quality: eBook Number of pages: 600 Description: Principles of ballast water management system (BWMS) operation The ERMA FIRST BWTS system developed by ERMA FIRST S.A. is autonomous, modular and reliable for the treatment of ballast water, with respect to the D-2 standard of the International Convention for the Control and Management of Ships’ Ballast Water and Sediments. Additional models were added in order to exceed all the special installation requirements either for New Building vessels or especially any retrofit project. During ballasting, the incoming/ upcoming water goes through filtration, to remove particles and organisms larger than 40 microns. The filtered water will then enter the electrolysis module where the remaining viable organisms will be eliminated. During de-ballasting, the system main components are by-passed while the neutralization module is operating. Water is discharged overboard -after neutralization. Ιsokinetic G2 sampling port is placed on the discharge line enabling authorities to sample treated ballast water prior to discharge and verify BWTS operation and efficiency.
Contents
CONTENTS OVERALL INFORMATION AND SPECIFICATIONS ELECTRICAL CONNECTIONS AND WIRING 1 HANDLING, INSTALLATION AND STORAGE 1.1 SAFETY INSTRUCTIONS 2 ENVIRONMENT, HEALTH AND SAFETY (EHS) REQUIREMENTS 2.1 ENVIRONMENTAL EFFECT OF ERMA FIRST BWTS 3 MANUFACTURER’S INFORMATION 3.1 MARKING REQUIREMENTS 4 PRINCIPLES OF BALLAST WATER MANAGEMENT SYSTEM (BWMS) OPERATION 4.1 PROCESS/TECHNOLOGY LIMITATIONS OF THE ERMA FIRST BWTS FIT 200 5 MAJOR SYSTEM COMPONENTS 5.1 FILTER 5.1.1 Normal Flow Pattern 5.1.2 Flushing Cycle 5.1.3 Service Clearance Guidelines 5.2 SUCTION PUMP 5.3 ELECTROLYZER(S) 5.3.1 Installation instructions Monitoring 5.4 TRANSFORMER/ RECTIFIER (T/R) UNIT 5.4.1 Preventive maintenance 5.4.2 Troubleshooting instructions 5.5 TRO SENSORS 5.5.1 Installation instructions 5.5.2 Reagents lifetime 5.6 FLOW METER 5.7 NEUTRALIZATION MODULE 5.8 MONITORING AND CONTROL AUXILIARY EQUIPMENT 5.9 BWTS CONTROL PANEL 5.9.1 Control panel switches/ buttons 5.10 REPEATER PANEL 5.11 VISUAL AND AUDIO MEANS 5.11.1 For the control panel 5.11.2 For the repeater panel 5.12 HUMAN MACHINE INTERFACE (HMI) 6 OPERATION 6.1 DESCRIPTION OF BWTS CONDITIONS AND MODES 6.2 OPERATING VALVES FOR BOTH BALLAST AND DE-BALLAST OPERATION 6.3 BALLAST OPERATION 6.3.1 Ballast operation 6.4 DE-BALLAST OPERATION 6.4.1 De-Ballast operation 6.5 ALARMS 6.5.1 Alarms list - During ballasting 6.5.2 Alarms list - During De-ballasting 6.6 TROUBLESHOOTING 7 MAINTENANCE SCHEDULES 7.1 UPON FAILURE 8 ERMA FIRST BWTS FIT 0201 SCOPE OF SUPPLY [BOM] 9 SPARE PARTS LIST 9.1 FILTER 9.2 TRO MONITOR 9.3 DOSING PUMP (DDA 30-4) 9.4 CONTROL PANEL 9.5 VALVES 9.6 DIAPHRAGM AIR PUMP 10 BWTS 0201 CERTIFICATES 10.1 CERTIFICATE FROM GREEK AUTHORITY [IMO-TYPE APPROVAL] 10.2 LR APPROVAL 10.3 USCG APPROVAL 10.4 LIBERIA APPROVAL 10.5 CYPRUS TYPE APPROVAL 10.6 INVENTORY OF HAZARDOUS MATERIALS 11 DATA RETRIEVAL
Вы не можете начинать темы Вы не можете отвечать на сообщения Вы не можете редактировать свои сообщения Вы не можете удалять свои сообщения Вы не можете голосовать в опросах Вы не можете прикреплять файлы к сообщениям Вы не можете скачивать файлы
Ballast Water Treatment System Erma First Manual
Year: 2019
Language: russian / английский
Author: Manual
Genre: Manual
Format: PDF
Quality: eBook
Number of pages: 600
Description: Principles of ballast water management system (BWMS) operation
The ERMA FIRST BWTS system developed by ERMA FIRST S.A. is autonomous, modular and reliable for
the treatment of ballast water, with respect to the D-2 standard of the International Convention for
the Control and Management of Ships’ Ballast Water and Sediments.
Additional models were added in order to exceed all the special installation requirements either for
New Building vessels or especially any retrofit project.
During ballasting, the incoming/ upcoming water goes through filtration, to remove particles and
organisms larger than 40 microns. The filtered water will then enter the electrolysis module where
the remaining viable organisms will be eliminated.
During de-ballasting, the system main components are by-passed while the neutralization module is
operating. Water is discharged overboard -after neutralization.
Ιsokinetic G2 sampling port is placed on the discharge line enabling authorities to sample treated
ballast water prior to discharge and verify BWTS operation and efficiency.
Contents
CONTENTSOVERALL INFORMATION AND SPECIFICATIONS
ELECTRICAL CONNECTIONS AND WIRING
1 HANDLING, INSTALLATION AND STORAGE
1.1 SAFETY INSTRUCTIONS
2 ENVIRONMENT, HEALTH AND SAFETY (EHS) REQUIREMENTS
2.1 ENVIRONMENTAL EFFECT OF ERMA FIRST BWTS
3 MANUFACTURER’S INFORMATION
3.1 MARKING REQUIREMENTS
4 PRINCIPLES OF BALLAST WATER MANAGEMENT SYSTEM (BWMS) OPERATION
4.1 PROCESS/TECHNOLOGY LIMITATIONS OF THE ERMA FIRST BWTS FIT 200
5 MAJOR SYSTEM COMPONENTS
5.1 FILTER
5.1.1 Normal Flow Pattern
5.1.2 Flushing Cycle
5.1.3 Service Clearance Guidelines
5.2 SUCTION PUMP
5.3 ELECTROLYZER(S)
5.3.1 Installation instructions
Monitoring
5.4 TRANSFORMER/ RECTIFIER (T/R) UNIT
5.4.1 Preventive maintenance
5.4.2 Troubleshooting instructions
5.5 TRO SENSORS
5.5.1 Installation instructions
5.5.2 Reagents lifetime
5.6 FLOW METER
5.7 NEUTRALIZATION MODULE
5.8 MONITORING AND CONTROL AUXILIARY EQUIPMENT
5.9 BWTS CONTROL PANEL
5.9.1 Control panel switches/ buttons
5.10 REPEATER PANEL
5.11 VISUAL AND AUDIO MEANS
5.11.1 For the control panel
5.11.2 For the repeater panel
5.12 HUMAN MACHINE INTERFACE (HMI)
6 OPERATION
6.1 DESCRIPTION OF BWTS CONDITIONS AND MODES
6.2 OPERATING VALVES FOR BOTH BALLAST AND DE-BALLAST OPERATION
6.3 BALLAST OPERATION
6.3.1 Ballast operation
6.4 DE-BALLAST OPERATION
6.4.1 De-Ballast operation
6.5 ALARMS
6.5.1 Alarms list - During ballasting
6.5.2 Alarms list - During De-ballasting
6.6 TROUBLESHOOTING
7 MAINTENANCE SCHEDULES
7.1 UPON FAILURE
8 ERMA FIRST BWTS FIT 0201 SCOPE OF SUPPLY [BOM]
9 SPARE PARTS LIST
9.1 FILTER
9.2 TRO MONITOR
9.3 DOSING PUMP (DDA 30-4)
9.4 CONTROL PANEL
9.5 VALVES
9.6 DIAPHRAGM AIR PUMP
10 BWTS 0201 CERTIFICATES
10.1 CERTIFICATE FROM GREEK AUTHORITY [IMO-TYPE APPROVAL]
10.2 LR APPROVAL
10.3 USCG APPROVAL
10.4 LIBERIA APPROVAL
10.5 CYPRUS TYPE APPROVAL
10.6 INVENTORY OF HAZARDOUS MATERIALS
11 DATA RETRIEVAL
Screenshots
Примечание от: zxc [перевести]
Несоблюдение правил: 4.8,
BWTS ERMA FIRST.rar
Скачать [18 KB]
Поделиться